Application Errors: The 7 Most Common Mistakes in Waterproofing, is one of the most serious problems frequently encountered in construction projects. When waterproofing is done incompletely or incorrectly, the life of the structure is shortened. In addition, costs increase and user satisfaction decreases. Application quality is as important as choosing the right material. However, these critical steps are ignored in many projects. We will explain these mistakes in detail below.
1. Inadequate Surface Preparation
Water insulation applications that are started without surface preparation will fail. If the process is carried out without cleaning the concrete surfaces and removing the roughness, the material will not adhere properly. This will cause the insulation to deteriorate over time. Professional surface preparation This problem can be easily avoided with .
2. Not Choosing the Right Material
Every project is different, but in many applications, the use of a single type of material is seen. Areas such as floors, roofs and walls have different characteristics. Sempoly expert team provides correct product guidance in this regard. Environmental factors should also be taken into consideration when selecting materials.
3. Keeping the Layer Thickness Insufficient
The insulation layers must be of sufficient thickness. However, this detail is overlooked in many construction sites. Thin applications look good at first glance, but in the long run, they leak water. To prevent this mistake, product technical sheets should be examined carefully.
4. Ignoring Detailed Points
Edges, corners and joints are the most critical areas in waterproofing. However, these points are often neglected. Focusing only on flat surfaces is a big risk. In detail solutions Special profiles and tapes used minimize this problem. Thus, water leaks are prevented.
5. Not Complying with Drying Periods
Each insulation product has a certain drying time, but this time is often not followed. If there is not enough waiting between layers, the insulation system will be damaged. At the same time, working while the ground is wet also creates problems. Technical support The correct application sequence can be created by taking
6. Misuse of Application Equipment
Even if the material is of good quality, it loses its function due to the use of incorrect equipment. Using a spatula instead of a brush or a roller instead of a sprayer creates insufficient coating. Equipment should be selected according to the characteristics of the product. Sempoly product manuals provides detailed information on this subject.
7. Delivering Work Without Inspection
When the application is completed, final checks must be made. However, in some projects, this stage is skipped completely. When post-application tests are left incomplete, the error is overlooked. With expert support The tests performed increase the work quality and provide a long-lasting solution.
